# 11 Mill Extension Central Division, Under Construction - AMCGN 0656
View of the construction site of the # 11 Mill Extension and the Cloth Store House, looking west. In the foreground railroad tracks run north and south, behind the tracks excavation and some foundation work has begun on the Cloth Store House, in the background scaffolding can be seen around the # 11 Mill extension, windows have been framed in, but the roof is not completely on. This is evident by looking at the top floor and seeing sky through ...
Record Type: Photo
-
# 11 Mill Extension Central Division, Under Construction - AMCGN 0657
View of the construction site of the # 11 Mill Extension and the Cloth Store House, looking north west from the north side of the boiler house. In the foreground railroad tracks run north and south in front of the excavation of the Cloth Store House where laying of the foundation has begun. In the background to the left scaffolding surrounds the extension where the building of walls and framing in of the windows continue. To the right of the e...
Record Type: Photo
-
# 11 Mill Extension Central Division, Under Construction - AMCGN 0660
View of the construction site of the # 11 Mill Extension and the excavation of the Cloth Store House looking south west. In the foreground to the left railroad tracks are visible that will run between the Cloth Store House and the Cotton Store House. In the Center and to the right excavation can be seen where the Cloth Store House will be built. In the background to the left scaffolding can be seen surrounding the # 11 Mill Extension where the...
Record Type: Photo
-
# 11 Mill Extension Central Division, Under Construction - AMCGN 0682
View of the construction site of the # 11 Mill Extension Central Division, looking north from on top of the Foundry. Construction crews can be seen on the third floor framing in windows and building walls. Behind the construction is the # 11 Mill, to the left the Main Street buildings can be seen, to the right behind the trees the Barn is visible.
Record Type: Photo
-
# 11 Mill Extension Central Division, Under Construction - AMCGN 0683
View of the construction site of the # 11 Mill Extension Central Division looking north east from the yard south west of the extension. Scaffolding surrounds the extension, walls are in various stages of completion, and windows are being framed in. The west elevation of the # 11 Mill is visible beyond the extension.
Record Type: Photo
-
# 11 Mill Extension Central Division, Under Construction - AMCGN 0684
View of the construction site of the # 11 Mill Extension Central Division looking north east from the yard south west of the extension. Scaffolding surrounds the extension walls are in various stages of completion, and windows are being framed in. The west elevation of the # 11 Mill is visible beyond the extension.
Record Type: Photo
-
# 11 Mill Extension Central Division, Under Construction - AMCGN 0685
View of the construction site of the # 11 Mill Extension looking south east from the front yard of the # 11 Mill. Scaffolding surrounds the extension walls are being built and windows are being framed in. In the background to the right the Boiler House Chimney Central Division and the roof and Chimney of the Foundry can be seen.
Record Type: Photo
-
# 11 Mill Extension Central Division, just completed - AMCGN 0612
View of the # 11 Mill with Extension, Central Division, completed project with small building attached to the south end of the extension. The location from which the photograph was taken is west of the Wagon Shed and north of the future site of the # 12 Mill, looking north east. Note the small building that is attached to the extension is unnamed in the 1909 drawing used for reference, it is possible that this where the # 5 Engine is housed. ...
Record Type: Photo
-
# 11 Mill Extension Central Division, just completed - AMCGN 0613
View of the # 11 Mill with Extension, Central Division, completed project with small building attached to the south end of the extension. The Wagon Shed visible on the right is obscuring most of this building, but the chimney can be seen over top the shed. Note that this two story structure is unnamed in the 1909 drawing used for reference, it is possible that this where the # 5 Engine is housed. The location from which the photograph was take...
Record Type: Photo
-
# 11 Mill Extension Under Construction - AMCGN 0103
View of the south west elevation of the # 11 Mill Central Division, looking north east down McGregor Street, March 19, 1891. Taken from a high vantage point from a building across the street, (note shadow in the field to the right). In the foreground is McGregor Street and sidewalk where four boys lean against a fence and two boys are in front of them. Behind the fence is an open yard and to the left is # 11 Mill. The roof of the Cotton Store...
Record Type: Photo
-
# 11 Mill Extension Under Construction - AMCGN 0344
View of the construction site of the # 11 Mill Extension, Central Division looking north. Start of excavation and foundation, March 27, 1891, railroad tracks lead from the south to the construction site, several of flat bed railroad cars are visible. A number of construction workmen can be seen between the railroad cars and # 11 Mill, also visible is a hoist used to unload granite blocks used in the foundation
Record Type: Photo
-
# 11 Mill Extension Under Construction - AMCGN 0345
View of the construction site of the # 11 Mill Extension, Central Division. Showing the first foundation March 28, 1891. Looking north at the east side of the construction site as workers lay the foundation, while supervisors watch from the left side and children look on from above and to the right.
Record Type: Photo
-
# 11 Mill Extension Under Construction - AMCGN 0346
View of the construction site of the # 11 Mill Extension, Central Division looking north east. Taken from the front yard at the south end of the construction site, north of the stables on April 17, 1891. Construction crews have excavated the area for the outside walls, foundation has been laid in some places and exterior walls are starting to go up. Other construction workers can be seen throughout the site doing various task. Railroad tracks...
Record Type: Photo
-
# 11 Mill Extension Under Construction - AMCGN 0347
View of the construction site of # 11 Mill Extension looking north east, April 21, 1891. Construction workers are laying the foundation, while others work on framing in the first floor windows. Several railroad flat cars are loaded with bricks, and in the foreground supervisors go over plans. In the background several mills are visible on the east side of the Merrimack River, including the Stark Mill Picker House (East), and behind Amory Mill ...
Record Type: Photo
-
# 11 Mill Extension Under Construction - AMCGN 0348
View of the construction site of # 11 Mill Extension Central Division, looking north east, April 21, 1891. Construction working on foundation, and framing in the first floor windows and flooring for the first floor. Railroad cars are on the site loaded with bricks, Mill can be seen on the east side of the Merrimack River which include Stark Mill Picker House, Amory Boiler House Chimney, and # 3 Mill Amory Mill. copy neg available
Record Type: Photo
-
# 11 Mill Extension Under Construction - AMCGN 0349
View of the construction site of # 11 Mill Extension, Central Division May 2, 1891. Looking north west across the site where construction workers are working on the foundation, in the foreground railroad cars are loaded with granite for the foundation. Other workers can be seen on the far right building walls, framing in windows and working on the flooring for the first floor. In the background are the Main Street Buildings on McGregor Street.
Record Type: Photo
-
# 11 Mill Extension Under Construction - AMCGN 0350
View looking north east at the construction site of # 11 Mill Extension, Central Division, May 2, 1891. Construction crews are working on the first floor of the extension, railroad cars loaded with granite used for the foundation can be seen on the east side of the construction site. In the background beyond the site is the Cloth Store House, on the east side of the Merrimack River other mills are visible and include starting behind the McGrego...
Record Type: Photo
-
# 11 Mill Extension Under Construction - AMCGN 0351
View looking south of the construction site of # 11 Mill Extension Central Division, May 2, 1891. Taken from # 11 Mill looking down on the first floor of the extension and the construction site. Men can be seen on the first floor surveying construction, on the left side of the floor several men are laying bricks, while men can be seen on the ground working on the foundation. In the center of the image railroad cars are visible loaded with gra...
Record Type: Photo
-
# 11 Mill Extension Under Construction - AMCGN 0352
View looking north east at the construction site of # 11 Mill Extension Central Division, May 9, 1891. Showing a section of the first floor as windows are being framed in. To the left is the # 11 Mill, construction workers are seen installing windows in the background.
Record Type: Photo
-
# 11 Mill Extension Under Construction - AMCGN 0353
View looking north west at the construction site of the # 11 Mill Extension, Central Division, May 15, 1891. In the foreground construction crews work on granite blocks for the foundation, to the left other crews unload bricks from railroad cars, while in the background workers can be seen on the second floor laying bricks. In the background to the left is one of the Main Street Buildings.
Record Type: Photo